Pool tiling work has to fit inside a planned closure, and the closure is only as short as the planning behind it. Here is why this winter is a good time to start planning work for next year.

Specialist tiles take time to arrive
Pool tiles, step treads, edge tiles and other special pieces come from specialist suppliers. Some special orders take six to seven weeks to arrive, and occasionally longer. Ordering early means the materials are on site before the pool is drained, not weeks after.
Cure time has to be built into the closure
Epoxy grout needs time to cure before a pool is refilled, typically around seven days depending on the product. Draining, preparation, repairs, regrouting, curing and refilling all need to fit inside the closure. Planning the sequence early is what keeps it short.
Hidden problems are easier to handle with time
Once tiles are lifted, it is common to find more behind them than expected, such as loose render or weak bedding. When the work has been planned with time to spare, these problems can be dealt with properly without pushing back the reopening date.
What to do this winter
- Walk the pool and surround and photograph any missing grout, loose or cracked tiles and stained areas.
- Agree the dates of your next planned closure.
- Get the pool assessed and quoted, so materials can be ordered in good time.
- Book the work in early, so the dates suit your programme.