Leisure centres and public pools

Leisure centre pool refurbishment: every closure day matters.

A closed pool affects lessons, memberships, bookings and revenue. We plan the sequence carefully, keep sound work in place where we can, and build cure and refill time into the programme from the start.

Planning

Agreed in advance, reviewed as we go

  • Scope, materials, access and working areas confirmed before the pool is drained
  • Coordination with the operator throughout
  • Progress kept under review
  • Hidden defects or programme risks flagged promptly
Agreed in advance, reviewed as we go
Targeted repair

Compare a local repair with a full refurbishment

A careful assessment can identify local defects, preserve sound work and help you compare a targeted repair with a larger refurbishment. Keeping sound tiles can avoid the cost and disruption of stripping and replacing everything.

Compare a local repair with a full refurbishment
The details swimmers see

Lane markings, steps, edges and channels

Lane lines, entry steps, edge tiles and drainage channels take the most wear and are the first things people notice. We bring a tiler’s eye to each of them so the work suits the pool around it.

Lane markings, steps, edges and channels
Projects

Our team’s previous pool experience

All projects
Good to know

Questions we are often asked

All questions
Can you work on the main pool while the learner pool stays open?

Often, where the pools are separate and the site can keep the areas apart safely. We plan access, dust and noise around what stays open.

How do you keep a leisure centre closure as short as possible?

By inspecting before the shutdown, ordering materials early and agreeing the programme with your plant team and other contractors, so nobody is waiting on anyone.

Do you work with our pool plant contractor?

Yes. We agree drain down, cure times and refill with whoever manages your water treatment and plant.

Can you carry out repairs during a planned shutdown?

Yes. A planned shutdown is a good time for a tap test, grout checks and targeted repairs, so problems are found before they close the pool.

Start with an estimate

Tell us about your pool.

Send a few details and we’ll get back to you to understand the job. Photos of the tiles, grout and problem areas help us a lot, and you can add them below.

Dan or Jay will be in touch within 24 hours.

What affects the estimate?

  • The pool area and which surfaces need work
  • Joint size and the grout or tiles involved
  • The condition of the tiles, joints and background
  • Access to the pool and the working areas
  • Preparation, cleaning and any repairs needed first
  • The programme and when the pool can close

Photos of the tiles, grout and problem areas. Large photos are made smaller before sending.

WhatsApp Dan