School pool

Merchant Taylors' School, Northwood

A full rip out and retile of the pool surround, pool edge tiles and drainage channel tiles at Merchant Taylors' School in Northwood, over about four to five weeks.

Venue
Merchant Taylors' School
Location
Northwood
Work
Full rip out and retile of the surround, pool edge and drainage channel tiles
Duration
About 4 to 5 weeks

What we did

  • The pool surround fully ripped out and retiled
  • The pool edge tiles ripped out and retiled
  • The drainage channel tiles ripped out and retiled

The result

A fully retiled pool surround, with new pool edge tiles and drainage channel tiles, completed in about four to five weeks.

Photos

On site

Start with an estimate

Tell us about your pool.

Send a few details and we’ll get back to you to understand the job. Photos of the tiles, grout and problem areas help us a lot, and you can add them below.

Dan or Jay will be in touch within 24 hours.

What affects the estimate?

  • The pool area and which surfaces need work
  • Joint size and the grout or tiles involved
  • The condition of the tiles, joints and background
  • Access to the pool and the working areas
  • Preparation, cleaning and any repairs needed first
  • The programme and when the pool can close

Photos of the tiles, grout and problem areas. Large photos are made smaller before sending.

WhatsApp Dan