What we did
- The pool surround fully ripped out and retiled
- The pool edge tiles ripped out and retiled
- The drainage channel tiles ripped out and retiled
The result
A fully retiled pool surround, with new pool edge tiles and drainage channel tiles, completed in about four to five weeks.

















